Now showing items 1-11 of 11

    • Drain 27 Wetland Restoration 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
      Environmental Assessment Virtual Presentation
    • Drayton Dam Fish Passage Mitigation Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 1/18/2013)
      The purpose of this project is to improve fish passage at Drayton Dam on the Red River.
    • Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
      Finding of no significant impact (FONSI)
    • FEMA/USACE Coordination Plan 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
      Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
    • Final Feasibility Report and Environmental Impact Statement 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
      This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
    • Final Supplemental Environmental Assessment #2 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (U.S. Army Corps of Engineers, 2019-02)
      2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ...
    • Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
      Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
    • Record of Decision 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
    • Signed Report of the Chief of Engineers 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
      Report submitted to Congress.
    • Supplemental Environmental Assessment 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
      The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River ...
    • Wild Rice Dam Removal Mitigation Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)
      The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...