Now showing items 72-91 of 222

    • Family Plan and Rehabilitation Programs, Standing Rock Reservation 

      Missouri River Basin Investigations Project (1964)
      This report describes the principal provisions of the settlement made by the United States for Standing Rock Sioux Indian properties acquired for the Oahe Reservoir, and the main uses made of settlement funds by Standing ...
    • Fargo Flood Oral History; Mark McCourt 

      McCourt, Mark (NDSU Libraries, 6/2/2022)
      Oral history by Mark McCourt describes his experience in the 1997 and 2009 floods in Fargo, ND. This oral history was collected as part of a exhibit Disasters: Stories we share, a traveling exhibit funded by the NEH. Any ...
    • Fargo Flood Oral History; Zachary Drechsel 

      Drechsel, Zachary (NDSU Libraries, 2023)
      Drechsel describes his experience helping residents in Moorhead during the floods of 1997 and 2009. his oral history was collected as part of a exhibit Disasters: Stories we share, a traveling exhibit funded by the NEH. ...
    • Fargo, Construct winter sports building 

      United States. Works Projects Administration (U.S. National Archives and Records Administration, 1938)
      Construct winter sports building, field house with bleachers, offices, showers and lockers (Island Park, corner of 1st ave and 7th st.)
    • Fargo, improve and extend water 

      United States. Works Projects Administration. (U.S. National Archives and Records Administration., 1938)
      Administrative documents relating to Works Projects Administration project to improve and extend water and sanitary sewage system
    • Fargo-Moorhead Flood Risk Management Project Dam Safety and Public Waters Work Permit Findings of Fact, Conclusions and Order of Commissioner. 

      State of Minnesota Department of Natural Resources (State of Minnesota Department of Natural Resources, 2018-12-27)
      Pursuant to the requirements of Minn. Stat. § 103G.245, subd. 1 and Minn. R. Ch. 6115 the Cities of Fargo, North Dakota and Moorhead, Minnesota together with the U.S. Army Corps of Engineers (“USACE”) and the Flood Diversion ...
    • FEMA/USACE Coordination Plan 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
      Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
    • Final Environmental Impact Statement 

      State of Minnesota Department of Natural Resources (State of Minnesota Department of Natural Resources, 2016-05)
      The Flood Diversion Board of Authority (Diversion Authority) is proposing to construct the FargoMoorhead Flood Risk Management Project (Project) with an estimated cost of $1.8 billion (October 2011 dollars). The Project ...
    • Final Feasibility Report and Environmental Impact Statement 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
      This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
    • Final Supplemental Environmental Assessment #2 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (U.S. Army Corps of Engineers, 2019-02)
      2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ...
    • Final Supplemental Environmental Impact Statement 

      State of Minnesota Department of Natural Resources (State of Minnesota Department of Natural Resources, 2018-12-26)
      The DNR has determined the Final Supplemental Environmental Impact Statement (SEIS), published November 13, 2018, is adequate. This means that the state's environmental review process is now complete. Our basis for that ...
    • Final Technical Memorandum; Diversion inlet gate analysis 

      Houston-Moore Group (Flood Diversion Authority, 10/1/2013)
      The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long diversion ...
    • Finding aid, WPA collection 

      United States. Works Projects Administration. (NDSU Libraries, 2022)
      A descriptive list of the WPA projects in National Archives Record Group: 69, Stack 530, 66:2:3 box 736, roll 625 on North Dakota WPA projects, 1938-194. Includes OP numbers, cities, counties, names of individuals listed ...
    • Forman, construct school bus garage, landscape grounds 

      United States. Works Projects Administration. (U.S. National Archives and Records Administration., 1938)
      Administrative documents relating to Works Projects Administration project to  construct school bus garage, landscape grounds and apputenant work in the city of Forman.
    • Forman, water works extension 

      United States. Works Projects Administration (U.S. National Archives and Records Administration, 1938)
      Administrative documents relating to Works Projects Administration project to water works extension
    • Fort Union Trading Post 

      United States. National Park Service (1986)
      Official Map and Guide
    • Fredonia, improve school buildings, school district-wide 

      United States. Works Projects Administration. (U.S. National Archives and Records Administration., 1938)
      Administrative documents relating to Works Projects Administration project to improve school buildings, school district-wide
    • Garrison Diversion Unit Biological Investigations: 1979 Annual Report 

      United States. Bureau of Reclamation; United States. Department of the Interior. Water and Power Resources Office. Upper Missouri-Souris Project Office (1980)
      This progress report summarizes biological data collected in the Annual Report (USBR 1979). These studies were undertaken to update and improve the information on existing wildlife resources.
    • General Management Plan, Development Concept Plans, Land Protection Plan, Environmental Assessment, Theodore Roosevelt National Park, North Dakota 

      United States. National Park Service (1986)
      Review draft. This document was prepared to replace the 1973 Master Plan for Theodore Roosevelt National Park. That plan has become obsolete and no longer applicable for resolution of current issues involving the park. Two ...
    • Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project 

      West Consultants Inc. (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
      A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...