Now showing items 1-11 of 11

    • Drain 27 Wetland Restoration 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
      Environmental Assessment Virtual Presentation
    • FEMA/USACE Coordination Plan 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
      Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
    • Final Feasibility Report and Environmental Impact Statement 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
      This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
    • Final Technical Memorandum; Diversion inlet gate analysis 

      Houston-Moore Group (Flood Diversion Authority, 10/1/2013)
      The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long diversion ...
    • Garrison Diversion Unit Biological Investigations: 1979 Annual Report 

      United States. Bureau of Reclamation; United States. Department of the Interior. Water and Power Resources Office. Upper Missouri-Souris Project Office (1980)
      This progress report summarizes biological data collected in the Annual Report (USBR 1979). These studies were undertaken to update and improve the information on existing wildlife resources.
    • Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project 

      West Consultants Inc. (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
      A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...
    • Oxbow Hickson Bakke Ring Levee, Technical Memorandum 

      Houston-Moore Group (Flood Diversion Authority, 3/12/2013)
      Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
    • Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
      Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
    • The Role of Wetlands in Providing Flood Control Benefits 

      Cernohous, Len (1979-12)
      The recent major flood events in North Dakota's Souris and Red River Basins have been linked to flood plain development, wetland drainage, changes in land use and a “wet cycle.” All these factors can influence the degree ...
    • Supplemental Environmental Assessment 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
      The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River ...
    • Through Flood Damage Reduction Area 

      Houston-Moore Group (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
      The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...