Search
Now showing items 11-15 of 15
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)
The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild
Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long
diversion ...
Drain 27 Wetland Restoration
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
Environmental Assessment Virtual Presentation
Signed Report of the Chief of Engineers
(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
Report submitted to Congress.
Record of Decision
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...