Search
Now showing items 11-20 of 35
REGIL Meeting - August 4, 2020
(REGIL, 2020-08-04)
REGIL normally meets during the DLC Spring and Fall conferences, this year the meeting was delayed due to the pandemic. The topic of the meeting was developing claims lists.
Regional Libraries Meeting
(REGIL, 2019-10-22)
Minutes of the 2019 Regional Libraries Meeting, held at the Federal Depository Library Conference, Arlington, Virginia
REGIL Membership 2004-2020
(REGIL, 2020-11-01)
Members of REGIL 2004-2020
REGIL meeting, October 2020
(2020-10-21)
Evaluation of Fish, Benthic Invertebrates and Physical Habitat of Rivers Potentially Affected by the Fargo/Moorhead Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-02)
URS Corporation (URS), on behalf of the United States Army Corps of Engineers - St. Paul District (USACE), conducted a biological assessment to identify and characterize fish and invertebrate communities and biotic integrity ...
Through Flood Damage Reduction Area
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...
Final Supplemental Environmental Assessment #2
(U.S. Army Corps of Engineers, 2019-02)
2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ...
Final Feasibility Report and Environmental Impact Statement
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
Oxbow Hickson Bakke Ring Levee, Technical Memorandum
(Flood Diversion Authority, 3/12/2013)
Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
Finding of no significant impact (FONSI)