Through Flood Damage Reduction Area
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...
Oxbow Hickson Bakke Ring Levee, Technical Memorandum
(Flood Diversion Authority, 3/12/2013)
Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)
The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild
Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long
diversion ...