Search
Now showing items 1-4 of 4
Minutes of the Regional Libraries, October 16th, 2012
(2012-10-16)
Topics include: ASERL, HathiTrust, TRAIL, FDLP forecast project
Through Flood Damage Reduction Area
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...
Record of Decision
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...