Final Feasibility Report and Environmental Impact Statement
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
FEMA/USACE Coordination Plan
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history
of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the
Wild Rice River ...
Drain 27 Wetland Restoration
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
Environmental Assessment Virtual Presentation