Final Supplemental Environmental Assessment #2
(U.S. Army Corps of Engineers, 2019-02)
2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ...
Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
Finding of no significant impact (FONSI)
Wild Rice Dam Removal Mitigation Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)
The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...
FEMA/USACE Coordination Plan
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history
of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the
Wild Rice River ...
Drain 27 Wetland Restoration
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
Environmental Assessment Virtual Presentation
Signed Report of the Chief of Engineers
(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
Report submitted to Congress.
Record of Decision
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)