Search
Now showing items 21-30 of 30
FEMA/USACE Coordination Plan
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history
of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the
Wild Rice River ...
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)
The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild
Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long
diversion ...
Signed Report of the Chief of Engineers
(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
Report submitted to Congress.
Record of Decision
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...
Final Environmental Impact Statement
(State of Minnesota Department of Natural Resources, 2016-05)
The Flood Diversion Board of Authority (Diversion Authority) is proposing to construct the FargoMoorhead Flood Risk Management Project (Project) with an estimated cost of $1.8 billion (October 2011 dollars). The Project ...
Final Supplemental Environmental Impact Statement
(State of Minnesota Department of Natural Resources, 2018-12-26)
The DNR has determined the Final Supplemental Environmental Impact Statement (SEIS), published November 13, 2018, is adequate. This means that the state's environmental review process is now complete. Our basis for that ...
Fargo-Moorhead Flood Risk Management Project Dam Safety and Public Waters Work Permit Findings of Fact, Conclusions and Order of Commissioner.
(State of Minnesota Department of Natural Resources, 2018-12-27)
Pursuant to the requirements of Minn. Stat. § 103G.245, subd. 1 and Minn. R. Ch. 6115 the Cities of Fargo, North Dakota and Moorhead, Minnesota together with the U.S. Army Corps of Engineers (“USACE”) and the Flood Diversion ...
Dam Safety & Public Water Work Permit
(State of Minnesota Department of Natural Resources, 2018-12-27)
To construct, operate, and maintain the dam; to excavate and fill in Public Waters; to realign a portion of the Red River; and to
construct the Red River Control Structure and the Wolverton Creek Structure; all associated ...