Oxbow Hickson Bakke Ring Levee, Technical Memorandum
(Flood Diversion Authority, 3/12/2013)
Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
Finding of no significant impact (FONSI)
Drayton Dam Fish Passage Mitigation Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/18/2013)
The purpose of this project is to improve fish passage at Drayton Dam on the Red River.
Wild Rice Dam Removal Mitigation Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)
The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...
Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
FEMA/USACE Coordination Plan
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history
of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the
Wild Rice River ...
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)
The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild
Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long
diversion ...
Drain 27 Wetland Restoration
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
Environmental Assessment Virtual Presentation
Signed Report of the Chief of Engineers
(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
Report submitted to Congress.