Now showing items 81-100 of 222

    • Glen Ullin, water distribution system 

      United States. Works Projects Administration (U.S. National Archives and Records Administration, 1938)
      Administrative documents relating to Works Projects Administration project to construct a water distribution system, including digging of a well, construction of a pumphouse and repairing the present reservoir.
    • Drayton Dam Fish Passage Mitigation Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 1/18/2013)
      The purpose of this project is to improve fish passage at Drayton Dam on the Red River.
    • Wild Rice Dam Removal Mitigation Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)
      The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...
    • Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
      Finding of no significant impact (FONSI)
    • Signed Report of the Chief of Engineers 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
      Report submitted to Congress.
    • Record of Decision 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
    • Final Feasibility Report and Environmental Impact Statement 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)
      This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ...
    • Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
      Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
    • FEMA/USACE Coordination Plan 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)
      Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.
    • Drain 27 Wetland Restoration 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)
      Environmental Assessment Virtual Presentation
    • Lidgerwood, school auditorium 

      United States. Works Projects Administration (U.S. National Archives and Records Administration, 1938)
      Administrative documents relating to Works Projects Administration project to construct a school auditorium and perform work incidental in the city of Lidgerwood, Richland County.
    • Lisbon, demolition of old court house 

      United States. Works Projects Administration (U.S. National Archives and Records Administration, 1938)
      Administrative documents relating to Works Projects Administration project to demolish old court house, salvage and store materials for use on future building projects. Construct curbs, gutters and sidewalks, landscape ...
    • Oxbow Hickson Bakke Ring Levee, Technical Memorandum 

      Houston-Moore Group (Flood Diversion Authority, 3/12/2013)
      Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
    • Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project 

      West Consultants Inc. (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)
      A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ...
    • Through Flood Damage Reduction Area 

      Houston-Moore Group (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
      The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...
    • Evaluation of Fish, Benthic Invertebrates and Physical Habitat of Rivers Potentially Affected by the Fargo/Moorhead Flood Risk Management Project 

      URS Corporation (United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-02)
      URS Corporation (URS), on behalf of the United States Army Corps of Engineers - St. Paul District (USACE), conducted a biological assessment to identify and characterize fish and invertebrate communities and biotic integrity ...
    • Final Technical Memorandum; Diversion inlet gate analysis 

      Houston-Moore Group (Flood Diversion Authority, 10/1/2013)
      The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long diversion ...
    • Supplemental Environmental Assessment 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
      The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River ...
    • Final Supplemental Environmental Assessment #2 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (U.S. Army Corps of Engineers, 2019-02)
      2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ...
    • Fargo Flood Oral History; Mark McCourt 

      McCourt, Mark (NDSU Libraries, 6/2/2022)
      Oral history by Mark McCourt describes his experience in the 1997 and 2009 floods in Fargo, ND. This oral history was collected as part of a exhibit Disasters: Stories we share, a traveling exhibit funded by the NEH. Any ...