Now showing items 14-20 of 20

    • Oxbow Hickson Bakke Ring Levee, Technical Memorandum 

      Houston-Moore Group (Flood Diversion Authority, 3/12/2013)
      Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
    • Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)
      Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
    • Record of Decision 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012)
    • Signed Report of the Chief of Engineers 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)
      Report submitted to Congress.
    • Supplemental Environmental Assessment 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
      The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River ...
    • Through Flood Damage Reduction Area 

      Houston-Moore Group (United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)
      The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ...
    • Wild Rice Dam Removal Mitigation Project 

      United States. Army Corps of Engineers. St. Paul District (U.S.) (United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)
      The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...