Evaluation of Fish, Benthic Invertebrates and Physical Habitat of Rivers Potentially Affected by the Fargo/Moorhead Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-02)
URS Corporation (URS), on behalf of the United States Army Corps of Engineers - St. Paul District (USACE), conducted a biological assessment to identify and characterize fish and invertebrate communities and biotic integrity ...
Oxbow Hickson Bakke Ring Levee, Technical Memorandum
(Flood Diversion Authority, 3/12/2013)
Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ...
Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)
Finding of no significant impact (FONSI)
Drayton Dam Fish Passage Mitigation Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/18/2013)
The purpose of this project is to improve fish passage at Drayton Dam on the Red River.
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history
of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the
Wild Rice River ...
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)
The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild
Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long
diversion ...