Show simple item record

dc.contributor.authorUnited States. Army Corps of Engineers. St. Paul District (U.S.)
dc.description.abstract2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US Army Corps of Engineers (USACE) completed the Final Feasibility Report and Environmental Impact Statement (FEIS) for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project (Project) in July 2011. This document focuses primarily on the modifications to the alignment of the Southern Embankment and the passage of more flow through town during project operation.en_US
dc.publisherU.S. Army Corps of Engineersen_US
dc.titleFinal Supplemental Environmental Assessment #2en_US
dc.typeTechnical Reporten_US
dc.date.accessioned2022-07-13T13:21:32Z
dc.date.available2022-07-13T13:21:32Z
dc.date.issued2019-02
dc.identifier.urihttps://hdl.handle.net/10365/32784
dc.subject.lcshFlood control.
dc.subject.lcshFlood damage protection -- North Dakota -- Fargo.
dc.subject.lcshRed River of the North.
dc.subject.lcshFlood damage prevention -- Minnesota -- Moorhead.
dc.title.alternativeModifications to the Fargo Moorhead Metropolitan Area Flood Risk Management Projecten_US
dc.language.isoen_USen_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record