dc.contributor.author | United States. Army Corps of Engineers. St. Paul District (U.S.) | |
dc.description.abstract | This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally Preferred Plan (LPP) and includes a North Dakota diversion channel (20,000 cfs), upstream storage and staging, associated structures, non-structural features, recreation features and environmental mitigation. | en_US |
dc.publisher | United States. Army Corps of Engineers. St. Paul District (U.S.) | en_US |
dc.title | Final Feasibility Report and Environmental Impact Statement | en_US |
dc.type | Technical Report | en_US |
dc.date.accessioned | 2022-07-18T16:07:12Z | |
dc.date.available | 2022-07-18T16:07:12Z | |
dc.date.issued | 2011-07 | |
dc.identifier.uri | https://hdl.handle.net/10365/32795 | |
dc.subject.lcsh | Red River of the North. | |
dc.subject.lcsh | Flood damage protection -- North Dakota -- Fargo. | |
dc.subject.lcsh | Flood damage prevention -- Minnesota -- Moorhead. | |
dc.subject.lcsh | Water diversion. | |
dc.language.iso | en_US | en_US |