Performance of a Retrofit Detention Basin in Fargo, ND

No Thumbnail Available

Date

2019

Journal Title

Journal ISSN

Volume Title

Publisher

North Dakota State University

Abstract

“The Fargo Project” located in Fargo, North Dakota, is an 18-acre stormwater detention basin that was retrofitted in 2015 to include an earthen-channel, sediment forebay, and various native vegetation within the floodplain and channels. Goals of this study were to assess how the post-retrofit earthen-channel performs relative to the pre-retrofit concrete-channel in terms of conveyance of small storms, and to estimate infiltration and evaporation from the post-retrofit detention basin during various storm sizes and intensities. Results showed that although channel roughness ultimately increased in the post-retrofit basin and allowed for greater instances of flooding for one channel, erosion of the main channel, with a larger urbanized contributing area, resulted in behavior similar to that of the pre-retrofit main channel for small storms. Modeled infiltration and evaporation showed total abstraction ranging between 2.9% and 11.7% of the maximum ponded volume for various storm sizes and intensities.

Description

Keywords

Citation