Oxbow Hickson Bakke Ring Levee, Technical Memorandum

dc.contributor.authorHouston-Moore Group
dc.date.accessioned2022-07-13T15:06:18Z
dc.date.available2022-07-13T15:06:18Z
dc.date.issued3/12/2013
dc.description.abstractOperation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study and subsequent cost estimate related to a value engineering proposal include costs to purchase all structure in the staging area resulting in a total buyout of the Oxbow, Hickson, and Bakke (OHB) area.en_US
dc.identifier.urihttps://hdl.handle.net/10365/32790
dc.language.isoen_USen_US
dc.publisherFlood Diversion Authorityen_US
dc.subject.lcshFlood damage protection -- North Dakota -- Fargo.
dc.subject.lcshFlood damage prevention -- Minnesota -- Moorhead.
dc.subject.lcshWater diversion.
dc.subject.lcshRed River of the North.
dc.titleOxbow Hickson Bakke Ring Levee, Technical Memorandumen_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
TM_OHB_20120312.pdf
Size:
14.56 MB
Format:
Adobe Portable Document Format
Description:
Oxbow Hickson Bakke Ring Levee Technical Memorandum

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed to upon submission
Description: