United States. Army Corps of Engineers. St. Paul District (U.S.)2022-07-182022-07-182011-07https://hdl.handle.net/10365/32795This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally Preferred Plan (LPP) and includes a North Dakota diversion channel (20,000 cfs), upstream storage and staging, associated structures, non-structural features, recreation features and environmental mitigation.en-USRed River of the North.Flood damage protection -- North Dakota -- Fargo.Flood damage prevention -- Minnesota -- Moorhead.Water diversion.Final Feasibility Report and Environmental Impact StatementTechnical Report