Houston-Moore Group2022-07-132022-07-133/12/2013https://hdl.handle.net/10365/32790Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study and subsequent cost estimate related to a value engineering proposal include costs to purchase all structure in the staging area resulting in a total buyout of the Oxbow, Hickson, and Bakke (OHB) area.en-USFlood damage protection -- North Dakota -- Fargo.Flood damage prevention -- Minnesota -- Moorhead.Water diversion.Red River of the North.Oxbow Hickson Bakke Ring Levee, Technical MemorandumTechnical Report