Final Feasibility Report and Environmental Impact Statement
Loading...
Date
2011-07
Journal Title
Journal ISSN
Volume Title
Publisher
United States. Army Corps of Engineers. St. Paul District (U.S.)
Abstract
This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally Preferred Plan (LPP) and includes a North Dakota diversion channel (20,000 cfs), upstream storage and staging, associated structures, non-structural features, recreation features and environmental mitigation.