Final Feasibility Report and Environmental Impact Statement

dc.contributor.authorUnited States. Army Corps of Engineers. St. Paul District (U.S.)
dc.date.accessioned2022-07-18T16:07:12Z
dc.date.available2022-07-18T16:07:12Z
dc.date.issued2011-07
dc.description.abstractThis Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally Preferred Plan (LPP) and includes a North Dakota diversion channel (20,000 cfs), upstream storage and staging, associated structures, non-structural features, recreation features and environmental mitigation.en_US
dc.identifier.urihttps://hdl.handle.net/10365/32795
dc.language.isoen_USen_US
dc.publisherUnited States. Army Corps of Engineers. St. Paul District (U.S.)en_US
dc.subject.lcshRed River of the North.
dc.subject.lcshFlood damage protection -- North Dakota -- Fargo.
dc.subject.lcshFlood damage prevention -- Minnesota -- Moorhead.
dc.subject.lcshWater diversion.
dc.titleFinal Feasibility Report and Environmental Impact Statementen_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Main_Report_with_Attachments.pdf
Size:
25.31 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed to upon submission
Description: