Browsing by Subject "Red River of the North."
Now showing items 1-20 of 20
-
Drain 27 Wetland Restoration
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020)Environmental Assessment Virtual Presentation -
Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013)Finding of no significant impact (FONSI) -
Evaluation of Fish, Benthic Invertebrates and Physical Habitat of Rivers Potentially Affected by the Fargo/Moorhead Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-02)URS Corporation (URS), on behalf of the United States Army Corps of Engineers - St. Paul District (USACE), conducted a biological assessment to identify and characterize fish and invertebrate communities and biotic integrity ... -
FEMA/USACE Coordination Plan
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015)Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application. -
Final Feasibility Report and Environmental Impact Statement
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07)This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally ... -
Final Supplemental Environmental Assessment #2
(U.S. Army Corps of Engineers, 2019-02)2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US ... -
Final Technical Memorandum; Diversion inlet gate analysis
(Flood Diversion Authority, 10/1/2013)The proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long diversion ... -
Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012)A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are ... -
Micro Community
(North Dakota State University, 2012)This book examines what occurs when we let the cycles of mother nature take precedent in the way we design through responsive creation of a small community on the banks of the Red River. As architects in the 21st century, ... -
Oxbow Hickson Bakke Ring Levee, Technical Memorandum
(Flood Diversion Authority, 3/12/2013)Operation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study ... -
Pollution Evaluation Survey of the Interstate Waters of the Red River of the North: North Dakota-Minnesota
(1970)This field survey was designed to determine the impact of waste sources in the Fargo - Moorhead area on the quality of the Red River of the North. The study area encompasses that portion of the River from Fargo - Moorhead ... -
Progress Evaluation Meeting : In the Matter of Pollution of the Interstate Waters of the Red River of the North and its Tributaries North Dakota-Minnesota : Transcript of Proceedings
(1967-12-06)Conference between participants representing the official water pollution control agencies of Minnesota, North Dakota, and the U.S. Dept. of the Interior. The purpose of the conference is to evaluate progress toward pollution ... -
Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016)Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. -
Record of Decision
(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012) -
Redesign to Protect: Constructed Wetlands for Flood Mitigation, Education, and Wildlife Habitat along the Red River
(North Dakota State University, 2021)The Red River runs north through the hearts of two densely populated urban cores in North Dakota, Fargo and Grand Forks. In 1997 and 2011, the Red River hit the 50-year floodplain and in 2009 reached the 100-year floodplain. ... -
Seeds To Grow | A Community led greenway
(2012)Project-based learning can positively influence community in the normally reactionary design of a riparian greenway. This thesis examines how a greenway system can affect a community by allowing its residents to play an ... -
Signed Report of the Chief of Engineers
(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011)Report submitted to Congress. -
Supplemental Environmental Assessment
(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09)The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River ... -
Through Flood Damage Reduction Area
(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012)The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project ... -
Wild Rice Dam Removal Mitigation Project
(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014)The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. ...