Metro Flood Diversion Authority
Permanent URI for this collectionhdl:10365/32782
Most information contained in this collection is from the Army Corps of Engineers.
Browse
Browsing Metro Flood Diversion Authority by Subject "Red River of the North."
Now showing 1 - 15 of 15
- Results Per Page
- Sort Options
Item Drain 27 Wetland Restoration(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/21/2020) United States. Army Corps of Engineers. St. Paul District (U.S.)Environmental Assessment Virtual PresentationItem Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota(United States. Army Corps of Engineers. St. Paul District (U.S.), 1/23/2013) United States. Army Corps of Engineers. St. Paul District (U.S.)Finding of no significant impact (FONSI)Item Evaluation of Fish, Benthic Invertebrates and Physical Habitat of Rivers Potentially Affected by the Fargo/Moorhead Flood Risk Management Project(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-02) URS CorporationURS Corporation (URS), on behalf of the United States Army Corps of Engineers - St. Paul District (USACE), conducted a biological assessment to identify and characterize fish and invertebrate communities and biotic integrity within the Red River of the North and six tributaries. These waterbodies were assessed because they could be affected by a potential flood damage reduction project at Fargo, North Dakota and Moorhead, Minnesota. The assessed waterbodies included Red River of the North, Wild Rice River, Sheyenne River, • Maple River, Rush River, Lower Rush River, and Wolverton Creek.Item FEMA/USACE Coordination Plan(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/14/2015) United States. Army Corps of Engineers. St. Paul District (U.S.)Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other impacts that are required for CLOMR Application.Item Final Feasibility Report and Environmental Impact Statement(United States. Army Corps of Engineers. St. Paul District (U.S.), 2011-07) United States. Army Corps of Engineers. St. Paul District (U.S.)This Final Feasibility Report and Environmental Impact Statement (FEIS) documents the analysis of alternatives developed to reduce flood risk in the entire Fargo-Moorhead Metropolitan area. The Selected Plan is the Locally Preferred Plan (LPP) and includes a North Dakota diversion channel (20,000 cfs), upstream storage and staging, associated structures, non-structural features, recreation features and environmental mitigation.Item Final Supplemental Environmental Assessment #2(U.S. Army Corps of Engineers, 2019-02) United States. Army Corps of Engineers. St. Paul District (U.S.)2019 revision of the Supplemental Environmental Assessment. The Red River basin in eastern North Dakota and western Minnesota has a long history of flooding due to the unique hydrology and topography of the area. The US Army Corps of Engineers (USACE) completed the Final Feasibility Report and Environmental Impact Statement (FEIS) for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project (Project) in July 2011. This document focuses primarily on the modifications to the alignment of the Southern Embankment and the passage of more flow through town during project operation.Item Final Technical Memorandum; Diversion inlet gate analysis(Flood Diversion Authority, 10/1/2013) Houston-Moore GroupThe proposed FM Diversion begins approximately 4 miles south (upstream) of the confluence of the Red and Wild Rice Rivers and extends west around the cities of Horace, Fargo, West Fargo, and Harwood. The 36 mile long diversion channel crosses several rivers. The project includes gated control structures at the Red and Wild Rice Rivers. It has aqueducts at the Sheyenne and Maple Rivers that allow low tributary flows to enter the interior of the project area while larger flows would be passed into the diversion. The diversion channel also crosses the Rush and Lower Rush Rivers as well as several drains. The diversion channel ultimately discharges into the Red River downstream from the Red River’s confluence with the Sheyenne River near the city of Georgetown, MNItem Geomorphology Study of the Fargo, ND & Moorhead, MN Flood Risk Management Project(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/25/2012) West Consultants Inc.A feasibility study designed by the US Army Corps of Engineers, St. Paul Di strict, to investigate flood issues in the Fargo, ND and Moorhead, MN metropolitan area began in September 2008. The objectives of the study are to manage flood risk and damages for the area; restore or improve degraded riverine and riparian habitat in and along the Red River of the North, Wild Rice River (North Dakota), Sheyenne River (North Dakota), and Buffalo River (Minnesota); provide additional wetland habitat in conjunction with other flood risk management features; and provide recreational opportunities in conjunction with other flood risk management features.Item Oxbow Hickson Bakke Ring Levee, Technical Memorandum(Flood Diversion Authority, 3/12/2013) Houston-Moore GroupOperation of the Fargo Moorhead Diversion results in the staging of flood water upstream of the Cities of Fargo and Moorhead, including the City of Oxbow, the Village of Hickson, and Bakke Subdivision. The feasibility study and subsequent cost estimate related to a value engineering proposal include costs to purchase all structure in the staging area resulting in a total buyout of the Oxbow, Hickson, and Bakke (OHB) area.Item Project Partnership Agreement Between the Department of the Army and the City of Fargo, North Dakota, and the City of Moorhead, Minnesota, and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/11/2016) United States. Army Corps of Engineers. St. Paul District (U.S.)Agreement between Fargo, Moorhead, the Army Corps of Engineers and the Metro Flood Diversion Authority for Construction of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.Item Record of Decision(United States. Army Corps of Engineers. St. Paul District (U.S.), 4/3/2012) United States. Army Corps of Engineers. St. Paul District (U.S.)Item Signed Report of the Chief of Engineers(United States. Army Corps of Engineers. St. Paul District (U.S.), 12/19/2011) United States. Army Corps of Engineers. St. Paul District (U.S.)Report submitted to Congress.Item Supplemental Environmental Assessment(United States. Army Corps of Engineers. St. Paul District (U.S.), 2013-09) United States. Army Corps of Engineers. St. Paul District (U.S.)The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River (ND), and the Sheyenne River, converge in the Fargo-Moorhead metropolitan area and contribute to extensive flooding. The Federally Recommended Plan (FRP) for the flood risk management project consists of a 36-mile diversion channel (six miles of which is a connecting channel) around the west side of the city of Fargo, a staging area, and approximately 12 miles of tie-back levees. The FRP is described as the Locally Preferred Plan (LPP) in the Final Feasibility Report and Environmental Impact Statement (FEIS) dated July 2011; a Record of Decision was signed on April 3, 2012.Item Through Flood Damage Reduction Area(United States. Army Corps of Engineers. St. Paul District (U.S.), 7/16/2012) Houston-Moore GroupThe purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project to the proposed fish passages on the Red and Wild Rice River control structures. This study evaluates River Stages (RS) beyond the approximately RS 31 feet planned for in the Integrated Final Feasibility Report and the Final Environmental Impact Statement (FR/FEIS) dated July 2011. This plan is now known as the Federally Recommended Plan (FRP).Item Wild Rice Dam Removal Mitigation Project(United States. Army Corps of Engineers. St. Paul District (U.S.), 10/1/2014) United States. Army Corps of Engineers. St. Paul District (U.S.)The St. Paul District, Corps of Engineers, has prepared this assessment of the environmental effects that may result from the proposed dam removal at the Wild Rice Dam on the Wild Rice River, Cass County, North Dakota. This assessment of the Corps of Engineers proposal is required by the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Corps of Engineers Procedures for Implementing NEPA (33 CFR Part 230).